Five six level office buildings above a basement car park with a Transelevator Car park Stacking Machine.
Construction Period: 90 weeks Project Manager: Styles Project Management Architect: RTA Studio Ltd Engineer: Brown and Thomson Quantity Surveyor: Rider Levett Bucknell
Dominion Road
Stage 1 and 2
Mainstreet commercial/retail development incorporating BNZ and ASB Banks. >more
Building One
Five level office development with a total floor plate of 6700m2 >more
Food processing
Commercial development
Two level retail and office development in a Marina setting >more
Waterfront Development
Restoration of one of the last remaining cargo sheds on Auckland’s waterfront which is a Category 1 listed >more
One Development
2700m2 three storey office building with retail/cafes to the ground floor >more
Commercial/residential
Large mixed use commercial/residential development including a five level carpark >more