Waitakere Central One Development

Client: Waitakere Properties Ltd a division of Waitakere City Council
Project Value: $NZ 4.6 million

2700m2 3 storey office building with retail / cafes to the ground floor.

Construction Period: 36 weeks
Completion: March 2007
Project Manager: MPM Projects Ltd
Architect: Ignite Architects Ltd
Engineer: Buller George Engineers Ltd
Quantity Surveyor: WT Partnership Ltd

  • Reinforced concrete frame, precast floors and structural steel roof frame
  • Coloursteel roof and wall cladding including extensive plywood eaves
  • Solar performance glazing, Complex integration of cladding systems, aluminium louvers to the external façade
  • Design Build Services. All services exposed as there are no suspended ceilings
  • Greenstar enhancements
  • Fitout of offices for Waitakere City Council
Anvil Building

Dominion Road

  • 600m2 of retail
  • 1500m2 of office and associated external decks
  •  >more
Broadway

Stage 1 and 2

Mainstreet commercial/retail development incorporating BNZ and ASB Banks.
 >more

Central Park

Building One

Five level office development with a total floor plate of 6700m2
 >more

Food Innovation

Food processing

  • Concrete and steel frame
  • Insulated coolroom panel wall cladding
  • Specialist hygenic
  •  >more
Ironbank

Commercial offices

Five six level office buildings above a basement car park with a Transelevator Car park stacking
 >more

Pine Harbour

Commercial development

Two level retail and office development in a Marina setting
 >more

Shed 10

Waterfront Development

Restoration of one of the last remaining cargo sheds on Auckland’s waterfront which is a Category 1 listed
 >more

Zone 23

Commercial/residential

Large mixed use commercial/residential development including a five level carpark
 >more