INDUSTRIAL

TOLL FREIGHT FORWARDING NZ

_MG_0425_2.jpg

CLIENT

Toll New Zealand

VALUE

NZ 90 million
 

TIMESPAN

98 Weeks
(Incl design and consent)

ARCHITECT

Williams Architects

PROJECT MANAGEMENT

RDT Pacific

ENGINEER

Day Consulting Ltd

QUANTITY SURVEYOR

BQH

_MG_0274.jpg
_MG_0460.jpg

Project description

  • Construction of 40,000m2 of warehouse and parcels area with 6,000m2 of A Grade office space over 3 levels with.
    Which includes:

    • Enabling site (cut/fill 60,000m3)

    • Embeded rail running through warehouse

    • Rail to Road cross-dock

    • Suspended structural steel gantry walkway

    • Pacific Steel Water Treatment plant ($12m)

    • Main arterial roadway upgrade ($10m)

  • MCCL engaged through a novated Design and Build


Construction                        

  • Steltech steel portal frame to warehouse

  • “Combi Slab” concrete warehouse slabs

  • Longrun metal roofing and wall cladding

  • Low height precast panel to warehouse breezeway with parallel docking

  • Feature precast to the offices

  • Vertical aluminium fins supported by decorative fascia PFC frame to office

  • Fully sprinklered building (warehouse, office, canopies)

  • Feature Frontline Altus aluminium windows, framed and supported with heavy steel plate

  • Heavy duty concrete yards with embedded rail

  • Complex heavy industry water treatment plant

  • This project is a 4 Star Greenstar project