top of page

COMMERCIAL

EMA OFFICE + CONFERENCE CENTRE

EMA - 517A7188.jpg

CLIENT

Location Group

VALUE

NZ 15 million

TIMESPAN

2 Years (Staged)

ARCHITECT

Team Architecture

PROJECT MANAGEMENT

RDT Pacific

EMA - 155 Kyber_MG_8308_1.jpg

Project description

  • This was a staged development to ensure carparking, conference and office space was not compromised during the construction. The result is a very high quality office space, with adjoining conference center, serviced by a 5 level carpark and café

  • MCCL contracted on an open-book ECI procurement model


Construction                        

  • The capark was largely steel frame construction, with speedfloor flooring system. Precast panels with webforge and mesh screening to the elevations, with a timber and aluminium louvre feature screen

  • The conference centre development was constructed utilising the existing steel portal frame, the conference rooms were suspended on a rib and infill system over the carparking on ground floor. The internal space was acoustically rated and ceiling feature of triton acoustic panellinG

  • The new four level office is accessed by a single lift separated by varying walkways on each level, with an external webforge staircase. An internal staircase to core of building serves all floors

  • Stepped full height glass façade

  • Webforge screening and frameless glass feature

  • Extensive mechanical services and control system

  • All buildings fully sprinklered with rising mains to stairways

  • Full height tiled bathrooms

  • High quality internal finishes - Carpet tile, suspended ceiling, partitioning, internal glazing

EMA - 517A7212.jpg
bottom of page