Construction of 6 Level Carpark building. MCCL were contracted under a negotiated contract.
Construction Details
Concrete bored piers
Structural steel construction with ‘K’ braced frame
Precast concrete lift and stair core + fire rated boundary panels
Speedfloor flooring system with concrete topping
Sprinklered building (co-ordinated to run through Speedfloor joists) with hydrant riser in core
Webforge Screens to stair core
Aluminium louvred screen, doubles as fall protection
Galvanised steel mesh screening
Schindler Lift
Honed and polished precast stair treads and risers
Project Details
Client: Location Group Ltd
Timespan: 42 Weeks
Engineers: Brown & Thompson Engineering Ltd
Architect: Team Architects Ltd
Value: $5.2 million
Quantity Surveyors: Kingston Partners Ltd