top of page
Fliway

Industrial

Fliway

3500m2 Cross dock Distribution Facility with 6000m2 of concrete yard. This was stage 1 of a larger distribution centre development for Fliway.

Construction Details

  • Post tensioned insitu cross dock slab and paving yard


  • Precast concrete columns and structural steel main frame


  • Coloursteel roof and wall cladding, 36 roller doors


  • Fully sprinkled building

Fliway

Project Details

Client: Fliway Cross Dock

Timespan: 20 weeks

Project Management: Resource Co-ordination Partnership

Architect: Eclipse Architects

Value: NZ 13.5 million

Quantity Surveyors: ---

Engineers: ---

Fliway
bottom of page