Industrial
Foodstuffs DC
Construction of 77,000m2 of single apex warehouse space to be used as a Distribution Centre. MCCL engaged through competitive tender
Construction Details
Enabling works included Lime and Cement stabilisation across the all warehouse, yard and right of ways
Steltech steel portal frame to warehouse
Post tensioned concrete warehouse slabs with ‘Ryno Joint’ to mitigate slab curl
Longrun metal roofing and wall cladding - 70m Sheets rolled directly onto the roof
Low height precast panel to warehouse with precast docking stations for loading/unloading
Designed to avoid the requirement of box gutter - Resulted in 16m Apex
Fully sprinklered building (warehouse, office, canopies) - Uplifted warehouse sprinkers to mitigate need for 20,000m2 suspended ceiling
Feature Frontline Altus aluminium windows, framed and supported with heavy steel plate
Heavy duty concrete yards and ROW
Complex unground services in combined service trench with full GIS survey asbuilts
Plant rooms and transformers to accommodate construction of 9000m2 office (separate contract)
Project Details
Client: Auckland International Airport
Timespan: 78 Weeks
Project Management: TSA Project Management
Architect: Eclipse Architecture
Value: NZ 72 million
Quantity Surveyors: RLB
Engineers: Day Consulting Ltd