Hellmann Logistics Stage 3 - AIAL
Construction of a 7,600m2 warehouse extension with A-Grade office and
full-length canopy.
MCCL contracted by single sourced negotiated procurement.
Construction Details
5 Star Design and Asbuilt rating
High stud Steltech portal frames
Post tensioned concrete warehouse slabs
Longrun metal roofing and wall cladding
Low height precast panel to warehouse
Architectural 3D steel fins to office
Fully sprinklered building (warehouse, office, canopies)
Feature Starke aluminium windows, framed and supported with heavy steel plate
Post tensioned concrete slab to FM1, FM2 and VNA DM1 to racked isles
Heavy duty concrete yards with shared ROW

Project Details
Client: Auckland International Airport Ltd
Timespan: 44 weeks
Project Manager: RDT Pacific Ltd
Architect: JWA Architects Ltd
Value: $15 million
Quantity Surveyor: RLB
Engineer: Day Consulting Ltd