Hellmann Logistics Stage 3 - AIAL

Construction of a 7,600m2 warehouse extension with A-Grade office and
full-length canopy.
MCCL contracted by single sourced negotiated procurement.

Construction Details

  • 5 Star Design and Asbuilt rating


  • High stud Steltech portal frames


  • Post tensioned concrete warehouse slabs


  • Longrun metal roofing and wall cladding


  • Low height precast panel to warehouse 


  • Architectural 3D steel fins to office


  • Fully sprinklered building (warehouse, office, canopies)


  • Feature Starke aluminium windows, framed and supported with heavy steel plate


  • Post tensioned concrete slab to FM1, FM2 and VNA DM1 to racked isles


  • Heavy duty concrete yards with shared ROW

Hellmann Logistics Stage 3 - AIAL

Project Details

Client: Auckland International Airport Ltd

Timespan: 44 weeks

Project Manager: RDT Pacific Ltd

Architect: JWA Architects Ltd

Value: $15 million

Quantity Surveyor: RLB

Engineer: Day Consulting Ltd

Hellmann Logistics Stage 3 - AIAL