top of page
Commercial
Ironbank, Commercial Development
Construction Details
Concrete piled basement constructed using ‘top down’ construction techniques
Podium beams/slab supporting structural steel tower structures
Externally ship lap glazed lift shaft James Hardie Hardieflex Cavity cladding creating a water tight building envelope
‘Exaplate’ steel rain screen cladding all to predetermined sizesto allow pre weathering of steel prior to erection
Project achieved Green Star as built rating of 5
Specific designed glazed aluminium windows integrated with a James Hardie Hardieflex Cavity cladding creating a water tight building envelope
Project Details
Client: Samson Corporation
Timespan: 90 Weeks
Project Management: Styles Project Management
Architect: RTA Studio
Value: NZ 38 million
Quantity Surveyors: ---
Engineers: ---
bottom of page