Ironbank, Commercial Development

Commercial

Ironbank, Commercial Development

Construction Details

  • Concrete piled basement constructed using ‘top down’ construction techniques


  • Podium beams/slab supporting structural steel tower structures


  • Externally ship lap glazed lift shaft James Hardie Hardieflex Cavity cladding creating a water tight building envelope


  • ‘Exaplate’ steel rain screen cladding all to predetermined sizesto allow pre weathering of steel prior to erection


  • Project achieved Green Star as built rating of 5


  • Specific designed glazed aluminium windows integrated with a James Hardie Hardieflex Cavity cladding creating a water tight building envelope

Ironbank, Commercial Development

Project Details

Client: Samson Corporation

Timespan: 90 Weeks

Project Management: Styles Project Management

Architect: RTA Studio

Value: NZ 38 million

Quantity Surveyors: ---

Engineers: ---