top of page
Project Saturn - EBoss - AIAL

Industrial, All

Project Saturn - EBoss - AIAL

Construction of a 10,500m2 temperature controlled warehouse with A-Grade office and full-length canopy.
MCCL contracted by single sourced negotiated procurement

Construction Details

  • 5 Star Design and Asbuilt rating


  • High stud Steltech portal frames


  • Post tensioned concrete warehouse slabs


  • Kingspan insulated panel roofing and wall cladding to warehouse


  • Low height precast panel to warehouse

 

  • Architectural steel portal frame to office and services area


  • Fusion rooftop package units to temperature controlled warehouse


  • PIR chiller, rework, vaccine and freezer rooms with a frost heave heated insulated floor


  • Fully sprinklered building (warehouse, office, canopies)


  • Feature Altus aluminium windows, framed and supported with heavy steel plate


  • Heavy duty concrete yards with shared ROW

Project Saturn - EBoss - AIAL

Project Details

Client: Auckland International Airport Ltd

Timespan: 49 weeks

Project Manager: RDT Pacific Ltd

Architect: JWA Architects Ltd

Value: $32 million

Quantity Surveyor: RLB

Engineer: Day Consulting Ltd

Project Saturn - EBoss - AIAL
bottom of page