Industrial
Rohlig Logistics + 15MWA
Construction of two warehouses (12,000m2 total) each with their own integrated offices and canopies. MCCL contracted under Early Contractor Engagement. Awarded 2018 PCNZ Best in Category -
Industrial.
Construction Details
High stud Steltech portal frames
Post tensioned concrete warehouse slabs
Longrun metal roofing and wall cladding
Low height precast panel to warehouse with feature precast to the offices
Powder-coated expanded mesh screening to offices
Fully sprinklered building (warehouse, office, canopies)
Feature Frontline Altus aluminium windows, framed and supported with heavy steel plate
Intensive integrated fitout to Rohlig Logistics
Heavy duty concrete yards with shared ROW
20,000 Litre Dangerous Goods store - 240 FRR Fire Rating
Project Details
Client: Auckland International Airport Ltd
Timespan: 34 weeks
Project Management: Xigo Ltd
Architect: JWA Architects Ltd
Value: NZ 17 million
Quantity Surveyors: Cuesko Ltd
Engineers: Day Consulting Ltd