Industrial
Toll Freight Forwarding NZ
Construction of 40,000m2 of warehouse and parcels area with 6,000m2 of A Grade office space over 3 levels with. Which includes: Enabling site (cut/fill 60,000m3), Embedded rail running through warehouse, Rail to Road cross-dock, Suspended structural steel gantry walkway, Pacific Steel Water Treatment plant ($12m), Main arterial roadway upgrade ($10m), MCCL engaged through a novated Design and Build.
Construction Details
Steltech steel portal frame to warehouse
“Combi Slab” concrete warehouse slabs
Longrun metal roofing and wall cladding
Low height precast panel to warehouse breezeway with parallel docking
Vertical aluminium fins supported by decorative fascia PFC frame to office
Fully sprinklered building (warehouse, office, canopies)
Altus aluminium windows supported with heavy steel plate
This project is a 4 Star Greenstar project
Project Details
Client: Toll New Zealand
Timespan: 98 Weeks (Incl design and consent)
Project Management: RDT Pacific
Architect: Williams Architects
Value: NZ 90 million
Quantity Surveyors: BQH
Engineers: Day Consulting Ltd