INDUSTRIAL

ROHLIG LOGISTICS + 15MWA

AWARD
‚Äč
2018 PCNZ Best in Category -
Industrial

CLIENT

Auckland International Airport Ltd

VALUE

NZ 17 million

TIMESPAN

34 weeks

ARCHITECT

JWA Architects Ltd

PROJECT MANAGEMENT

Xigo Ltd

ENGINEER

Day Consulting Ltd

QUANTITY SURVEYOR

Cuesko Ltd

Project description

  • Construction of two warehouses (12,000m2 total) each
    with their own integrated offices and canopies

  • MCCL contracted under Early Contractor Engagement


Construction                        

  • High stud Steltech portal frames

  • Post tensioned concrete warehouse slabs

  • Longrun metal roofing and wall cladding

  • Low height precast panel to warehouse with feature precast to the offices

  • Powder-coated expanded mesh screening to offices

  • Fully sprinklered building (warehouse, office, canopies)

  • Feature Frontline Altus aluminium windows, framed and supported with heavy steel plate

  • Intensive integrated fitout to Rohlig Logistics

  • Heavy duty concrete yards with shared ROW

  • 20,000 Litre Dangerous Goods store - 240 FRR Fire Rating

© 2019 Macrennie Commercial Construction   |   

+64 9 525 3330