COMMERCIAL

EMA CARPARK

CLIENT

Location Group Ltd

VALUE

$5.2 million

TIMESPAN

42 Weeks

ARCHITECT

Team Architects Ltd

ENGINEER

Brown & Thompson Engineering Ltd

QUANTITY SURVEYOR

Kingston Partners Ltd

Project description

  • Construction of 6 Level Carpark building

  • MCCL were contracted under a negotiated contract

 

Construction

  • Concrete bored piers

  • Structural steel construction with ‘K’ braced frame

  • Precast concrete lift and stair core + fire rated boundary panels

  • Speedfloor flooring system with concrete topping

  • Sprinklered building (co-ordinated to run through Speedfloor joists) with hydrant riser in core

  • Webforge Screens to stair core

  • Aluminium louvred screen, doubles as fall protection

  • Galvanised steel mesh screening

  • Schindler Lift

  • Honed and polished precast stair treads and risers